TRINFRA PORTALVizhinjam International Seaport Corridor: Industrial land aggregation & multimodal logistics pooling active in Trivandrum.
Explore Details
Shanghumugham Beach Restoration
CompletedStage: Completed
Shanghumugham Beach Promenade, Thiruvananthapuram•District: Thiruvananthapuram

Shanghumugham Beach Restoration

Engineering-grade diaphragm wall construction, coastal nourishment, and landscaped pedestrian promenade restoration along the Shanghumugham coastal front.

Total Area

2.5 km Shoreline Corridor

Landowners Pooled

3 Landowners

Milestone Progress

100%

Current Phase

Completed

Development Lifecycle

Overall Project Progress100%
Aggregation
Planning
Approvals
Development
5
Completed

Project Overview

The Shanghumugham Beach Restoration successfully reinforced the capital’s iconic heritage coastline. Utilizing deep diaphragm wall technology and subsurface tetrapod revetments, the project restored the arterial airport access roadway and rebuilt public amenities, open-air cultural amphitheatres, and wave-resistant sunset walkways.

Project Classifications & Sector Tags

Coastal ProtectionBeach RestorationTourism InfrastructureShanghumugham
PARTNER WITH TRINFRA

Developer & Investor Participation

Institutional developers and accredited investors can access detailed master plan drawings, feasibility assessments, and joint development frameworks for Shanghumugham Beach Restoration.

Submit Developer Enquiry

✓ Direct facilitation through TRINFRA Committee

✓ Complete clear-title land pooling verification

✓ Transparent regulatory liaison in Kerala

Key Parameters

District:Thiruvananthapuram
Location:Shanghumugham Beach Promenade, Thiruvananthapuram
Development Type:Land Pooling
Last Updated:2026-11-04