
Trivandrum Port Rail Connectivity
A 10.7 km dedicated rail freight corridor featuring a 9.02-km underground tunnel connecting the port directly to the Indian Railways national network at Balaramapuram.
Total Area
10.7 km Dedicated Alignment
Landowners Pooled
8 Landowners
Milestone Progress
68%
Current Phase
Development
Development Lifecycle
Project Overview
The Trivandrum Port Rail Connectivity guarantees seamless multimodal intermodal container transport directly from vessel-side to major inland container depots (ICDs) across peninsular India. Designed without level crossings and built by KRCL using advanced tunnel-boring methodology, this link allows double-stack container trains to clear customs within the port boundary.
Project Classifications & Sector Tags
Developer & Investor Participation
Institutional developers and accredited investors can access detailed master plan drawings, feasibility assessments, and joint development frameworks for Trivandrum Port Rail Connectivity.
Submit Developer Enquiry✓ Direct facilitation through TRINFRA Committee
✓ Complete clear-title land pooling verification
✓ Transparent regulatory liaison in Kerala